My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-11-05_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-11-05_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:48:20 PM
Creation date
11/21/2007 8:32:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
11/5/2004
Doc Name
VLF Boundary Area Liner Cert. Rpt
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_=Golder <br />-Associates <br />October 1, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44-Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 3: September 19 through September 25, 2004 <br />Cresson Project Phase II-III Extension Construction Quality Assurance <br />Dear Mr. Roberts: <br />' Golder Associates Inc. (Golder) is pleased to submit this summary of Construction Quality Assurance <br />(CQA) services performed for the Modified Amendment No. 7 boundary (Phase IUIII extension) <br />construcfion at the Cresson Project during the period of September 19 through September 25, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 29° F to 48° F, and highs ranged from 47° F to 66° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construcfion Srnopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase II-III <br />extension construction. Ames conducted Phase II-III extension construcfion activities on four days of <br />this seven-day reporting period (September 19 through September 22, 2004). Poly-flex conducted <br />Phase II-III extension repairs on one day of this seven day reporting period (September 19, 2004). <br />' Phase II-III Extension <br />Ames continued production of Drain Cover Fill (DCF) material at the screen plant by the secondary <br />crusher. <br />Ames commenced and completed hauling, placement and grading of DCF material into the Phase II-III <br />Extension adjacent to the southwest tie-in of Phases II and III. Ames placed DCF material per the <br />project plans onto approved geomembrane panels. <br />A map of the azea worked during this reporting period is provided in Attachment C. <br />Phase II-III 3 September 19-September 25, 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.