Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 07/292003 <br />User <br />JD1 <br />State :Colorado <br />County :Otero <br />Site :Rocky Ford East Pit <br />Permivjob# : M-1977-560 <br />Abbreviation :none <br />Filename : M560-004 <br />Agency or organization name :DMG <br />Permit or otherjob action :Phased reclamation <br />Task description :Move overburden to lake banks <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11- 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op.cosvhour <br />Operator cosvhour <br />Total unit cosUhour <br />Utilization <br />$50.76 NA <br />$61.72 100 <br />$0.00 0 <br />$24.01 NA <br />$136.49 To <br />Loose <br />1.125 volume <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br /> tal fleet cosUhour <br />volume : 7,050 CCY <br />Swell <br />factor <br />Source of estimated volume :calculation <br />Source of estimated swell factor : oroaram <br />HOURLY PRODUCTION <br />Average push distance : 120 feet <br />Unadjusted howdy production : 817.7 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 30.00 % (neg) <br />Average site altitude : 4,150 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight tlescription <br />Decomposed rock - 25% Rock, 75% Earth <br />conomon correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.10 (Cat HBJ <br />Dozing method : 1.20 (slot) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshifUdal <br />Spoil pile : 0.80 (fnd-rn <br />Push gradient : 1.60 (Cat HB) <br />Altitude : 1.00 (Caf HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.91 <br /> <br />Adjusted unit production : 746.78 LCY/hr <br />Adjusted fleet production : 746.78 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 10.62 Hours <br />Umt cost : $0.183 /LCY Total job cost : X1,450 <br />7,931 LCY <br />