My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-29_REVISION - M1977560
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977560
>
2003-07-29_REVISION - M1977560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 8:09:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977560
IBM Index Class Name
Revision
Doc Date
7/29/2003
Doc Name
Cost Summary Form
From
DMG
To
Valco Inc
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 07/29/2003 <br />User: JOf <br />State :Colorado <br />County :Otero <br />Site :Rocky Ford East Pit <br />PermiUjob# : M-1977-560 <br />Abbreviation :none <br />Filename : M560-005 <br />Agency or organization name :OMG <br />Permit or other job action :Phased reclamation <br />Task description :Smooth grade 1 <br />HOURLY EQUIPMENT COST <br />118/V <br />Basic machine :Cat D8R Sedes 11 - 8U <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cast Breakdown : Ownership cosUhour : $50.76 NA <br />Operating cost/hour : $61.72 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $24.01 NA <br />Total unit cosUhour : $136.49 Total fleet cosUhour : $136.49 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,083 LCY factor : NA volume : 10,083 LCY <br />Source of estimated volume :calculation <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 685.7 LCY/hr <br />Material consistency description <br />Average push gradient : 20.00 % (r <br />Average site altitude : 4,150 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Ton Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.148 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.63 <br />Spoil pile : 0.80 <br />Push gradient : 1.43 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 1.35 <br />Source <br />Adjusted unit production : 923.80 LCY/hr <br />Adjusted Fleet production : 923.80 LCY/hr <br />Total job time : 10.91 Hours <br />Total job cost : $1,490 <br />
The URL can be used to link to this page
Your browser does not support the video tag.