Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 0729/2003 <br />User : JDl <br />State :Colorado <br />County :Otero <br />Site :Rocky Ford East Pit <br />Agency or organization name :DMG <br />Permit or other job action :Phased re <br />Task description :$ry100th <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11- 8U <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank dnoer <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $50.76 NA <br />Operatingcost/hour : $61.72 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost/hour : $24.01 NA <br />Total unit cost/hour : $136.49 Total Fleet cosUhour : x136.49 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,990 LCY factor: NA volume : 4,990 LCY <br />Source of estimated volume :calculation <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 300 feet <br />Unadjusted hourly production : 314.3 LCY/hr <br />Material consistency description <br />Average push gradient : 0.00 % (I <br />Average site altitude : 4,150 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />__.__._. <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.578 /LCY <br />PermiUjob# : M-1977-560 <br />Abbreviation :none <br />Filename : M560-003 <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : t00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.75 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />236.16 LCY/hr <br />236.16 LCY/hr <br />21.13 Hours <br />