My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-29_REVISION - M1977560
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977560
>
2003-07-29_REVISION - M1977560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 8:09:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977560
IBM Index Class Name
Revision
Doc Date
7/29/2003
Doc Name
Cost Summary Form
From
DMG
To
Valco Inc
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 07/29/2003 <br />User: JDf <br />State :Colorado PermiUjob# :M-1977-560 <br />County :Otero Abbreviation :none <br />Site :Rocky Ford East Pit Filename :M560-002 <br />Agency or organization name :DMG <br />Permit or other job action ;Phased reclamation <br />Task description :Replace topsoi~ <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DSR Series 11- 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Utilization <br />Cost Breakdown : Ownership cost/hour : $50.76 Qo <br />Operating cosUhour : $61.72 <br />Ripper op. cost hour : $0.00 0 <br />Operator cosUhour: $24.01 NA <br />Total unit cosUhour : $136.49 Total fleet cosUhour X136.49 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 16,537 LCY factor : NA <br />Source of estimated volume :calculation <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 400 feet <br />Unadjusted hourly production : 188.9 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 4,150 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Tnn Snil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.841 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />1.44 <br />1.00 <br />0.86 <br />Adjusted unit production : 162.22 <br />Adjusted fleet production : 162.22 <br />Total job time : 101.94 <br />Total job cost : $13,914 <br />(Cat i <br />(Cat <br />(Cat <br />(S/Sl <br />LCY/hr <br />LCY/hr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.