Laserfiche WebLink
Buildi~s and Structures <br />United Companies plans to leave the office building and the maintenance shop <br />building for use by the next landowner. Both buildings are in good condition and <br />remain fully functional. <br />The small RV campground that is located to the south of the office building will also <br />be left in place. The campground is fully functional. It is expected that employees of <br />the new landowner will use the RV campground during the construction season. <br />Signs and Markers <br />The required sign is posted at the entrance to Phase I mining area. The main entrance <br />to the permitted area is located approximately % mite to the east of the Phase I <br />entrance. The perimeter of the permit area is coincidental with fences for much the <br />length. The Colorado River forms the southern boundary of the permit area at the <br />Phase I area. The eastern boundary is marked by a road between the Phase I area and <br />the Phase II and Casey Concrete properties. <br />The Phase I part of Reclamation Permit M-1979-205 has been mined and reclaimed. No <br />contaminated or acid forming materials were discovered during the mining of the site or <br />left in the ground following the completion of mining and reclamation activities. Grading <br />of the site includes sloping the sides of the two lakes that have been created and leveling <br />the remainder of the site. Topsoil has been redistributed at the slopes of both lakes and <br />the level areas of the site with the exception of the area that has been left for industrial <br />uses. Ground water has not been adversely affected by the extraction of grave] from this <br />site. Surface water quality is good and discharges of water from this part of the site are no <br />longer taking place. The site is well suited for the post mining land uses that will actually <br />take place at this location. <br />4 <br />