My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981-01-27_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1981-01-27_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 12:03:05 PM
Creation date
11/21/2007 8:00:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/27/1981
Doc Name
NARRATIVE DESCRIPTION OF THE AMENDMENT
From
CLIMAX MOLYBDENUM CO
To
MLRB
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACREAGE OF AFFECTED LANDS, TAILING DEPOSITION AREA <br />• <br />Total <br />Potential Bonded <br />Disturbs- Disturb- Disturb- <br />ance Buffer ance ance <br />L <br /> <br />1969 20 0 20 0 <br />1977 200 1114 1314 300 <br />1978 275 1039 1314 300 <br />1979 390 924 1314 575 <br />1980 Tailing depo. 505 809 1314 575 <br /> Per.road/intercept. 30 20 50 50 <br /> Total 535 829 1364 625 <br />1981 Tailing depo. 575 739 1314 650 <br /> Per.road/intercept.130 1002 1132 280 <br /> Total 705 1741 2446 930 <br />1982 Tailing depo. 650 664 1314 650 <br /> Per.road/intercept.280 852 1132 280 <br /> Total 930 1516 2446 930 <br />1983 Recalculation required in conjunction with the annual report. <br />The acreage originally allotted to the tailing area was <br />1314 acres. Through December 1980, tailing deposition had <br />covered 505 acres, leaving 809 acres as buffer. In 1981 and <br />1982, we anticipate that additional tailing deposition will not <br />exceed 70 and 75 acres respectively, bringing the total to 650 <br />acres by the end of 1982. <br />The technical revision approved in July, 1980, to begin <br />construction of the perimeter toad added 50 acres to the area <br />designated as the tailing area, bringing the total potentially <br />affected Iand to 1364 acres. However, only 30 of the 50 acres <br />exchanged from Area 21 were disturbed, leaving 20 acres as <br />buffer. <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.