My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981-01-27_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1981-01-27_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 12:03:05 PM
Creation date
11/21/2007 8:00:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/27/1981
Doc Name
NARRATIVE DESCRIPTION OF THE AMENDMENT
From
CLIMAX MOLYBDENUM CO
To
MLRB
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If disturbed, reclamation of the areas would be as <br />• discussed in the existing permit. <br />~ SEEPWATER CANAL/PUMPHOUSE (20) <br />We wish to incorporate this island of 4 acres between the <br />northwest end of the Seepwater Canal and the beginning of the <br />road which provides access around the perimeter of the tailing <br />pond. <br />The road occupies about one acre. The remaining 3 acres <br />are presently undisturbed and should remain as buffer, howevec, <br />if disturbed, reclamation would proceed as discussed in the <br />existing permit. <br />TOPSOIL STOCKPILES/ROADS (21) <br />• In July, 1980, we received approval of a technical <br />revision to begin construction of a road accessing the <br />perimeter of the tailing area and a barge pump in the northwest <br />corner of the pond. In the Technical Revision, we exchanged 50 <br />acres from the Ute Park topsoil stockpile area, and noted we <br />would request the return of that acreage when we submitted an <br />amendment. <br />We now request the return of the 50 acres to the <br />Stockpiles/Roads Area (21). (The 50 acres obtained by <br />Technical Revision are included in the acreage for the Tailing <br />Deposition Area in this amendment). <br />There is no change in the reclamation plan or timetable. <br />• <br />-9- <br />
The URL can be used to link to this page
Your browser does not support the video tag.