My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1981-01-27_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
1981-01-27_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 12:03:05 PM
Creation date
11/21/2007 8:00:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
1/27/1981
Doc Name
NARRATIVE DESCRIPTION OF THE AMENDMENT
From
CLIMAX MOLYBDENUM CO
To
MLRB
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAILING LINE/POWERLINE (16) and EAST BRANCH FLOOD BYPASS <br />• PIPELINE (17) <br />As indicated by a comparison of the existing map with the ' <br />amendment map, these adjustments are mainly a juggling of <br />affected land boundaries between areas 9, 16 and 17. The <br />Tailing Area (9) gained about 6 acres, 2 acres from the Tailing <br />Line Area (16) and 4 acres from the Flood Bypass Line Area <br />(17). There will be no change in the reclamation plan, ' <br />TAILING BUILDING/ROAD (18) <br />The tailing maintenance building presently occupies the <br />top of a hill which will ultimately be covered by tailing. <br />When necessary, the building will be moved to one of two sites. <br />The alternative sites are 200 yards north of its present <br />location (still within Area 18) or the Spotted Doe Area (22). <br />• The choice will depend on operational and space requirements at <br />the time (which will be about year 1990) and how the terrain <br />can be modified to meet these needs. <br />We wish to add 39 acres to the existing 6 acres, however, <br />' only 14 of the 39 acres may be disturbed, leaving 25 acres for <br />potential disturbance as buffer. <br />There will be no change in the reclamation plan. <br />MILL WATER RETURN LINE/POWERLINE (19) <br />We wish to incorporate two islands of 5 acres and 2 acres <br />' as affected land into this area to provide flexibility and <br />buffer in this highly active area. <br />\J <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.