My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-08-04_REVISION - M1978056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2004-08-04_REVISION - M1978056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:53:44 PM
Creation date
11/21/2007 7:55:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
8/4/2004
Doc Name
Reply to 2nd Adequacy Review Comments of 9 June 2004
From
Varra Companies Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
god Adequacy Review Comments <br />Page 2 of 5 <br />D. Submit the hydraulic analyses and Flood Control/Mitigation Plan to the Corps of <br />Engineers for their review; <br />E. Submit the hydraulic analyses and Flood ControUMitigation Plan to the Division <br />of Minerals and Geology for their preliminary review; <br />F. Finalize the Flood Control/Mitigation Plan. Based on the review comments <br />received, prepare final construction drawings, supporting hydraulic analyses, and <br />cost estimates; <br />G. Submit the Flood Conttol/Mitigation Plan as a technical revision to this <br />amendment to the Division of Mining and Geology for final review, comment, <br />and inclusion in the permit; <br />H. Construct the features as designed in the final Flood Control/Mitigation Plan; <br />I. Obtain as-built information on the constructed Flood ControUMitigation Plan and <br />submit a Letter of Map Revision to Weld County and FEMA for approval. <br />Anderson Consulting Engineers, Inc. anticipates the following general schedule for <br />completion of the Flood ControUMitigation Plan: <br />A. Completion of the preliminary Flood Contro]/Mitigation Plan: Approximately 2 <br />months; <br />B. Weld County review of the plan and CLOMR: Approximately 1 month; <br />(It is assumed that DMG and COE reviews will occur concurrently with the Weld <br />County and/or FEMA review) <br />C. FEMA review of CLOMR: Approximately 4 months; <br />D. Finalize the Flood ControUMitigation Plan: 2 months; <br />E. The Flood Control/Mitigation Plan will include a recommended sequence and <br />schedule for the construction of specific elements in the plan. The schedule will <br />indicate time frames at which periodic Letter of Map Revisions (LOMRs) maybe <br />submitted to FEMA to update the floodplain and floodway delineation. At a <br />minimum, one LOMR will be submitted after completion of all reclamation <br />grading activities. <br />COVC03 ACE 2nd Adequacy Rvw Comments mml.doc 7/6/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.