My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-08-04_REVISION - M1978056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2004-08-04_REVISION - M1978056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:53:44 PM
Creation date
11/21/2007 7:55:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
8/4/2004
Doc Name
Reply to 2nd Adequacy Review Comments of 9 June 2004
From
Varra Companies Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: Chris V~arr~a and Brad Janes, Varra Companies, Inc. <br />FROM: Chris Q~Patz~ P.E., Anderson Consulting Engineers, Inc. <br />SUBJECT: Durham Pib 117 Cache ]a Poudre River -Reply to 2"d Adequacy Review <br />Comments [ACE Project No. COVC03] <br />DATE: July 6, 2004 <br />The following are Anderson Consulting Engineers, Inc.'s comments and responses for <br />inclusion in your reply to DMG slated for delivery on July 1, 2004. Our responses are <br />presented and numbered following the ordering system in DMG's June 9a' , 2004 letter. <br />Four copies of each exhibit, for inclusion with these responses, are attached to this memo. <br />6.4.5 EXIIIBTT E -Reclamation Plan <br />16. Flood ControllMitigation Plan: <br />A Flood Control/Mitigation Plan will be prepared by Anderson Consulting Engineers, <br />Inc. The plan will include: a) final site reclamation grading; b) final grading and design <br />details for any portion, if any, of the dike to remain in place; and c) final grading and <br />design details for any controlled spill locations. The plan will include recommendations <br />and details for erosion control on the site including: a) at selected locations along the <br />right bank of the Cache la Poudre River on Varra Companies, Inc. property; b) at any <br />controlled spill locations; and c) along the edges of the proposed reclaimed pond if <br />required. <br />The following process is recommended for the completion the Flood Control/Mitigation <br />Plan: <br />A. Develop a preliminary Flood Contro]/Mitigation Plan. The plan will include <br />preliminary design concepts and costs for mitigating identified flooding issues <br />(i.e., lowering the berm and/or controlled spill structures) and erosion issues (i.e., <br />bank protection, grade controls, etc.); <br />B. Perform hydraulic analyses in support of the Flood Control/Mitigation Plan; <br />C. Submit the hydraulic analyses and Flood ControUMitigation Plan in the form of a <br />Conditional Letter of Map Revision (CLOMR) to Weld County and FEMA for <br />their conditional review; <br />COVC03 ACE 2nd Adequacy Rvw Commrnts mml.doc 7/6/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.