Laserfiche WebLink
Phase 4 <br />Total acres 9.37 <br />Acres to be reclaimed 1.4 <br />Acres under water (ave. depth 25') 8.05 <br />Gallons of water in pit 68.8 m.g. <br />Lineal feet of required liner 1,271 <br />Lineal feet of liner to close 2,306 <br />Total feet of liner 3,577 <br />Cost to reclaim acres not under water $4,197.20 <br />Cost to de-water pit $13,863.20 <br />Cost of required liner $92,846.55 <br />Cost of liner required to close $168 453.30 <br />Total cost to bond for phase 4 $279,360.25 <br />Phase 5 <br />Total acres 8.17 <br />Acres to be reclaimed 1.1 <br />Acres under water (ave. depth 25') 7.07 <br />Gallons of water in pit 57.6 m.g. <br />Lineal feet of required liner 0 <br />Lineal feet of liner to close 2,207 <br />Total feet of liner 2,207 <br />Cost to reclaim acres not under water $3,297.80 <br />Cost to de-water pit $11,606.40 <br />Cost of required liner 0 <br />Cost of liner required to close $161 221.35 <br />Total cost to bond for phase 5 $176,125.55 <br />Phase 6 <br />Total acres 12.45 <br />Acres to be reclaimed 1.5 <br />Acres under water (ave. depth 25') 10.95 <br />Gallons of water in pit 89.2 m.g. <br />Lineal feet of required liner 1,553 <br />Lineal feet of liner to close 1,393 <br />Total feet of liner 2,946 <br />Cost to reclaim acres not under water $4,497.00 <br />Cost to de-water pit $17,973.80 <br />Cost of required liner $113,446.65 <br />Cost of liner required to close $101.758.66 <br />Total cost to bond for phase 6 $237,676.11 <br />Phase 7 <br />Total acres 9.41 <br />Acres to be reclaimed 1.2 <br />Acres under water (ave. depth 25') 8.21 <br />Gallons of water in pit 6G.9 m.g. <br />4 <br />