My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-12-26_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2002-12-26_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:30 PM
Creation date
11/21/2007 7:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
12/26/2002
Doc Name
Adequacy Response
From
RC Rollin Consulting
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Management and administration 5% of contract price $3.35 <br />Total bond amount for liner/lf $73.05 <br />Phase 1 <br />Total acres 12.31 <br />Acres to be reclaimed 1.3 <br />Acres under water (ave. depth 25') 11.01 <br />Gallons of water in pit 89.7 million <br />Lineal feet of required liner 2,123 <br />Lineal feet of liner to close 887 <br />Total feet of liner 3,010 <br />Cost to reclaim 1.3 acres not under water @ $2,998.00 $3,897.00 <br />Cost to de-water pit @ $201.50 /m.g. $18,074.55 <br />Cost of required liner @ $73.05 /lf $155,085.15 <br />Cost of liner required to close @ $73.05/ If X64.795.35 <br />Total cost to bond fox phase 1 $241,852.05 <br />Phase 2 <br />Total acres 10.22 <br />Acres to be reclaimed 1.1 <br />Acres under water (ave. depth 25') 9.12 <br />Gallons of water in pit 74.3 m.g. <br />Lineal feet of required liner 531 <br />Lineal feet of liner to close 1,420 <br />Total feet of liner 1,951 <br />Cost to reclaim acres not under water $3,297.80 <br />Cost to de-water pit $14,971.50 <br />Cost of required liner $38,789.55 <br />Cost of liner required to close $103.731.00 <br />Total cost to bond for phase 2 $160,789.85 <br />Phase 3 <br />Total acres 8.34 <br />Acres to be reclaimed 1.25 <br />Acres under water (ave. depth 25') 7.24 <br />Gallons of water in pit 59.0 m.g. <br />Lineal feet of required liner 1,122 <br />Lineal feet of liner to close 2,084 <br />Total feet of liner 3,206 <br />Cost to reclaim acres not under water $3,747.50 <br />Cost to de-water pit $11,888.50 <br />Cost of required liner $81,962.10 <br />Cost of liner required to close $152.236.20 <br />Total cost to bond for phase 3 $249,834.20 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.