Laserfiche WebLink
Lineal feet of required liner ],147 <br />Lineal feet of liner to close 0 <br />Total feet of liner 1,147 <br />Cost to reclaim acres not under water $3,597.60 <br />Cost to de-water pit $13,480.35 <br />Cost of required liner $83,788.35 <br />Cost of liner required to close 0 <br />Total cost to bond for phase 7 $100,866.30 <br />We have tried to provide the information requested and in a form that we hope is acceptable <br />but if you have comments ox questions please contact me. <br />Key Rollin P.E. <br />NCCI 99-517-002 <br />