My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-31_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2007-08-31_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:15:59 PM
Creation date
11/21/2007 7:18:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
Revision
Doc Date
8/31/2007
Doc Name
Cost summary form
From
Agri-Did Garvel Pit
To
DRMS
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 08/31/2007 <br />User : KAP <br />State :Colorado permiUjob# :M-2000-030 <br />County :La Plata Abbreviation :none <br />Site :Agn-D!d Gravel Pif Filename :M030-005 <br />Agency or organization name :Colorado Division Of Reclamation Mining And Safet <br />Permit or other job action : SO <br />Task description :Spread Topsoil on Slope -active phase artd <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank upper <br />area <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRGJ <br /> Utilization <br />Cost Breakdown ~ Ownership cost/hour : $72.92 NA <br /> Operating cost/hour : $98.84 1p0 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost hour : $32.78 Nq <br /> Total unit cosUhour $204.53 Total fleet cosUhour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume : 900 CCY factor : 1.125 volume : 1,012 LCY <br />Source of estima ted volume :Reclamation Plan and Site Inspection <br />Source of estimated swell factor :Earth Dry Packed <br />HOURLY PRODUCTION ~ Job Condition Correction Facto <br /> rs <br />Source <br /> <br />Average push distance : <br />100 feet Operator skill : 0.75 (avg.) <br /> <br />Unadjusted hourly production : <br />1 <br />243 <br />2 LCY/hr Material consistency : 1.00 (Cat HB) <br /> , <br />. Dazing method : 1.00 <br />(gen.) <br /> <br />Material consistency description <br />: Visibility : 1.00 (avg.) <br /> <br />Consolidated stockpile Job effciency : 0.83 <br />(lshifUday) <br />'- Spoil pile : 0.80 (ind-dJ <br /> <br />Average push gradient : <br />30.00 % (neg) Push gradient : 1.60 (Cat HB) <br /> <br />Average site altitude : <br />6 <br />600 feet Altitude : 1.00 (Cat NB) <br /> , Material weight : 0.90 Cat HB <br />( ) <br /> <br />Material weight : <br />2 <br />550 Ibs/LCY Blade Type : 1.00 (S/SU/U) <br /> <br />Weight description , Net correction : 0.72 <br /> <br />Earth=Dry packed Adjusted unit production : 893.86 LCY/hr <br /> Adjusted fleet production : 893.86 LCY/hr <br />JOB TIME AND COST - <br />Fleet size : 1 Dozers) Total job time : 1.13 Hours <br />Unit cost : $0 229 /LCY_ Total job cost : $232 <br />
The URL can be used to link to this page
Your browser does not support the video tag.