My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-31_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2007-08-31_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:15:59 PM
Creation date
11/21/2007 7:18:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
Revision
Doc Date
8/31/2007
Doc Name
Cost summary form
From
Agri-Did Garvel Pit
To
DRMS
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organ <br />Task # : 006 <br />Date : 08/31/2007 <br />User: KAP <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />zation name :Colorado Division Of Reclamation Mining And Safefy <br />State :Colorado PermiUjob#:M-2000-030 <br />County : La Plata Abbreviation :none <br />Site :Agri-Dld Gravel Pit Filename : M030-006 <br />Permit or otherjob action : SO <br />Task description :Load and carry <br />HOURLY EQUIPMENT COST <br />from stockpile to pit floor <br />Description <br />Shift basis : 1 perday <br />Truck/loader team -Truck :Generic 8-70 cy, 6x4 <br />-Loader :CAT 938G (2003) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : fruck2 loader NA NA NA NA <br />Utilization-machine : 89 100 NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cost hour: $8.94 $16.77 NA NA NA NA <br />Operating cosUhour. $29.29 $24.89 NA NA NA NA <br />Ripper op. cost hour. NA NA NA NA NA NA <br />Operator cost/houn $21.75 $32.78 NA NA NA NA <br />Unit subtotals : $59.99 $74.44 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $194.41 Support : $0.00 Maintenance : $0.00 <br />Total work team costlhour : $194.41 <br />MATERIALQUANTITIES <br />Initial Swell Loose <br />volume: 11,000 CCY factor: 1.125 volume: 12,375 LCY <br />Material weight: 2,550 pounds/LCY Struck volume : 8.00 LCY <br />Descr.: Earth -Dry packed Heaped volume : 10.00 LCY <br />Rated payload : 27,280 pounds Average volume : 9.00 LCY <br />Payload capacity : 10.70 LCY Adjusted volume`: 10.00 LCY <br /> Final truck volume based on number of loader passes : 9.50 LCY <br /> 'truck volume atl~usled to not exceetl rated payload or heapetl volume <br />Loading Tool Canacitv : I JOb Condition Corrections : Site altitude (ff.) : 6,600 <br />Rated capacity (nom. heaped) : 3.250 LCY Truck Loader Source <br />Descr.: Loose material -mixed moist aggregates (95-100 Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.975 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 3.169 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.