My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-31_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2007-08-31_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:15:59 PM
Creation date
11/21/2007 7:18:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
Revision
Doc Date
8/31/2007
Doc Name
Cost summary form
From
Agri-Did Garvel Pit
To
DRMS
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division Of Reclamation <br />Permit or otherjob action : SO <br />Task description :Rip comaction on pit floor <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 _ <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank rinoer <br /> Data source : (CRC) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Dozer operating cosUhour : $98.84 100 <br />Ripper operating cosUhour : $7.51 100 <br />OperatorcosUhour : $32.78 NA <br />Total unit cost/hour : ~ $212.05 Total fleet cosUhour : $212.05 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 26.00 acres Rip depth (ft) : 1.50 Volume : 62,920 BCY or CCY <br />Source of estimated quantity :Reclamation Plan/site inspection <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />Unadjusted production <br />per selected method : 2,132.58 cu. yds./hour <br />Area : Avg. ripping depth : 1.50 feeUpass Site altitude : 6,600 feet <br />Average ripping width : 7.67 feeUpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 400.00 feet/pass Job efficiency factor : 0.83 (i shift/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.881 acres/hour Adjusted unit production : 1,770.04 cu. yds./hour <br />Unadjusted production : 2,132.58 cu. yds.lhour Adjusted fleet production : 1,770.04 cu. yds./hour <br /> <br />JOB TIME AND COS7 <br />Fleet size : 1 dozers) Total jobtime : 35.55 hours <br />Unit cost : $0.120 per cu. yd. Total job cost : $7,538 <br /> <br />And <br />
The URL can be used to link to this page
Your browser does not support the video tag.