Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 08/31/2007 <br />User : KAP <br />State :Colorado PermiUjob# : M-2000-030 <br />County :La Plata Abbreviation :none <br />Site :Agri-Dld Gravel Pit Filename : M030-003 <br />Agency or organization name :Colorado Division Of Reclamaton Mining And ; <br />Permit or other job action : SO <br />Task description :Grade pif floor- Phase 1, 2, 3 and active <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cost hour : $98.84 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cost hour : $32.78 NA <br />Total unit cosVhour : $204.53 Total fleet cosUhour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,000 CCY factor : 1.125 volume : 12,375 LCY <br />Source of estimated volume :Reclamation Plan and Site <br />Source of estimated swell factor :Earth Drv Packetl <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Partly consolidatetl stockoile <br />Average push gradient : 0.00 % (i <br />Average site altitude : 6, 600 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Dry packetl <br />~dition Correction Factors <br />Operator skill : 0.75 Source <br />(avg.) <br />Material consistency : 1.10 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/dal <br />Spoil pile <br />Push gradlenf : 0.80 <br />: 1.00 (fnd-rf) <br />(Caf HBJ <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.49 <br />Adjusted unit production <br />Adjusted fleet production <br />449.23 <br />449.23 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 27.55 Hours <br />Unit cost : $0.455 /LCY Total job cost : $5,634 <br />