My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-31_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2007-08-31_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:15:59 PM
Creation date
11/21/2007 7:18:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
Revision
Doc Date
8/31/2007
Doc Name
Cost summary form
From
Agri-Did Garvel Pit
To
DRMS
Type & Sequence
SO1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br /> CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION~~ <br />Task # : 002 State :Colorado PermiUjob# :M-2000-030 <br />Date: 08/31/2007 County :LaPlata Abbreviation :none <br /> <br />User : KAP <br />Site <br />:Agri-Dld Gravel Pit ___ <br />Filename :M030-002 <br />Agency or organization name :Colorado Division Of Reclamation <br />Permit or other job action : SO <br />Task description :Push overburden downslope <br />HOURLY EQUIPMENT COST <br />create fina13:1 <br />Basic machine :Cat 09R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shifr basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op.cosUhour: $0.00 0 <br />Operator cosUhour: $32.78 NA <br />Total unit cosUhour : $204.53 To[al fleet cost/hour: $204.53 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 19,000 CCY factor : 1.125 <br />Source of estimated volume :Reclamation Plan and Site <br />Source of estimated swell factor :Decomposed Rock <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 20.00 % (i <br />Average site altitude : 6,600 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />volume : 21,375 LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Source <br />0.75 (avg.) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshiff/day) <br />0.80 (fnd-r0 <br />1.43 (Caf HB) <br />1.00 (Cat HB) <br />0.87 (Cat HB) <br />1.00 (S/SU/U) <br />0.62 <br />1300.56 LCY/hr <br />1,300.56 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 16.44 Hours <br />Unit cost : $0.157 /LCY Total job cost : $3,362 <br />And <br />
The URL can be used to link to this page
Your browser does not support the video tag.