P3~ase IVb WeeMy Summary No. 30 Page 2 003-2203 <br />Ames continued excavation of the Phase TVb OSA geomembrane anchor trench at the Phase N b/c Yie- <br />in area, excavating approximately 700 linear feet of anchor trench in preparation for geomembrane <br />deployment. Ames also continued backfill and compaction of approximately 500 feet of Phase IVb <br />OSA geomembrane anchor trench. <br />Ames hauled, placed, and compacted Soil Liner Fill (SLF) material into the Phase TVb OSA on the east <br />slope of Chicken Hawk Hill (west of the PSSA). SLF material was worked, tested, and passed per <br />project specifications prior to SLF surface acceptance. <br />Ames continued placement of I3igh Volume Solution Collection System (HVSCS) secondary and <br />tertiary piping within the Phase TVb OSA limits, followed by Drain Cover Fill (DCF) haul and <br />placement per project specifications. Ames continued to haui and place DCF in the Phase TVb OSA on <br />the south-facing slopes of Raven Hill. Ames also removed DCF from the west Phase III azea in <br />prepazation for Phase IVb / Phase >II geosynthetics tie-in. <br />Ames corninued production of DCF at the screen plant located near the Secondary Crusher. Ames also <br />resumed limited production of SLF. <br />Poly-Flex continued deployment of 80-mil single-sided textured LLDPE geomembrane in the Phase <br />TVb OSA on the east-facing slope of Chicken Hawk 1=-Till. Poty-Flex deployed 80-mil single-sided <br />textured LLDPE geomembrane over an area of approximately 315,629 squaze feet in the Phase TVb <br />OSA during this reporting period. Geomembrane panels B-721 through B-828 were deployed, seamed, <br />and tested by Poly-Flex. Destructive fusion and extrusion seam samples DFb-205 through DFb-239 <br />and DXb-44 through DXb116 were marked and removed. The results of testing on destructive fusion <br />and extrusion samples DFb-192 through DFb-221, DFb-223 through DFb-239, and DXb-43 through <br />DXb-46 passed per project specification. DFb-222 failed to meet project specification and additional <br />destmctive samples (DFb-222a1 and DFb-222b1) were taken across approximately 35 linear feet of <br />fusion weld until passing conditions were met. The delineated failure across the seaming length was <br />capped and extrusion welded. <br />A map ofthe area worked during this reporting period is provided in Attachmern C. <br />Phase TVc <br />Ames did not perfom any constr=setion ac`uvities ;:-r the Phase IVc area during this reporting period. <br />ADR Liner Expansion <br />Ames hauled, placed, and compacted Soil Liner Fill (SLF) material into the ADR Liner Expansion area <br />west of the CC&V lab, SLF material was worked, tested, and passed per project specifications prior to <br />SLF surface acceptance. <br />Ames excavated and conshucted approximately 250 feet of LDT in the ADR Liner Expansion azea, <br />extending the Phase I LDT. Ames backfilled the 3-inch diameter PVC extension pipe with trench <br />bedding fill material and reconstructed the Leak Detection Sump maztlrole west ofthe end berm. <br />rn~,wwn~c~,-w~c'fo, zoo3 CaoiQer Associates inC. <br />