My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-15_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-09-15_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 6:51:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/15/2003
Doc Name
Weekly Construction Report
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A.SSOCl'lteS <br />September 4, 2003 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />.R~C~~~FD <br />Golder Associates ~ ~ r 31~ <br />44 Union Boulevard, ~~ty~0 'wJ <br />Lakewood, CO 80228 rn°~~aen~~ <br />(303) 980-0450 ~+ey <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 30: August 17 through August 30, 2003 <br />Cresson Project Phase IVb, c Constructeon Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase PJb and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of August 17 <br />through August 30, 2003. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 45° F to 55° F, and highs ranged from 62° F to 87° F. Weather <br />observations were made on eleven days of this fourteen-day reporting period. <br />Construction S ry_ropsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVb <br />construction. Ames conducted Phase IVb construction activities on eleven days of this fourteen-day <br />reporting period (August 18 through August 23 and August 25 through August 29). Poly-Flex <br />conducted Phase IVb construction activities on eleven days of this fourteen-day reporting period <br />(August 18 through August 23 and August 25 though P,ugust 29). <br />Phase IVb <br />Ames continued contouring and compaction of subgrade Structural Fill (SF} in preparation for Soil <br />Liner Fill (SLF) placement in the Phase PJb OSA on the east facing slopes of Chicken Hawk Hill, south <br />and west of the PSSA <br />Ames excavated and constructed approximately 450 feet of Leak Detection Trench (LDT) on the south <br />slope of Chicken Hawk Bill in the Phase IVb OSA area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.