My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-05-21_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
1985-05-21_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 3:48:57 PM
Creation date
11/21/2007 6:28:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
5/21/1985
Doc Name
USE OF EXPLOSIVES WYOMING FUEL CO NEW ELK MINE PN C-012-81
From
WYOMING FUEL CO
To
MLRD
Type & Sequence
MR5
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• NOTICE OF BLASTING SCHEDULE <br />NEW ELK MINE <br />WYOMING FUEL COMPANY <br />The Federal Surface Mine Control and Reclamation Acts of 1977 (Public Law 95-87) <br />requires all coal mines detonating more than the equivalent of five pounds of TNT to <br />publish a schedule of blasting in accordance with the requirements of 30 CFR 7LS.19. <br />In accordance with these requirements, Wyoming Fuel Company, operators of the <br />New Elk Mine located approximately 30 miles west of Trinidad, hereby provides public <br />notice of the planned blasting schedule for the area described below commencing on the <br />first day of July 1, 1985. <br />AREAS <br />A. Township 335, Range 68W, Section 14: 20 acres in the southern one-half of the <br />southwest quarter of the southeast quarter. <br />B. Township 335, Range 68 W, Section 22: 40 acres in the northwest quarter of <br />the northeast quarter. <br />DATES AND TIMES <br />Commencing on the first day of July, 1985, blasting will be done in the above areas <br />between the hours of 9:30 am to 11:30 am and 3:00 pm to 5:00 pm daily, Sunday through <br />Saturday. Operational considerations such as equipment breakdowns, temporary changes <br />in delivery schedule, weather, eic., may dictate that blasting not be done on some days. <br />• CONTROL OF ACCESS <br />The general mining area is identified by appropriate signs on all access roads which <br />designate it as a mining area and restricting entry to authorized personnel only. The <br />permitted area has signs at all entrances reading "Blasting Areas" and explaining blasting <br />warnings is controlled by mine personnel prior to the blast. All areas in which charged <br />holes are awaiting firing will be gaurded, barricaded and posted or flagged against <br />unauthorized entry. <br />AUDIBLE WARNING SLGNALS <br />A series of five long signals, a period of silence, then another series of five short <br />signals, on either a whistle or horn will be given before each detonation. One long <br />continuous horn or whistle signal will be given for all clear signal. <br />EMERGENCY DETONATIONS <br />Safety considerations may dictate detonations at times other than the above noted <br />time periods. The following conditions are defined in regulation (30 CFR 77) promulgated <br />under the Coal Mine Health and Safety Act of L969 and 1977 Amendments .Mine Safety <br />and Health Acts, shall be cause for detonations under emergency conditions: <br />A Destruction of damaged or deteriorated explosives or detonators in a safe <br />manner. <br />Disposal of misfires and/or undetonated explosives. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.