Laserfiche WebLink
• C. Firing of charged holes in soon as practical after cessation of static electricity <br />or stray current conditions when electric detonators are used. <br />D. Firing of charged holes when weather conditions indicate that a safety hazard <br />is imminent. <br />E. Operator safety or safety considerations for the general public. <br />Significant variations of mining and/or blasting requirements may dictate <br />modifications of the above schedule. If the proposed changes are necessary over a <br />signifcant period of time, a new schedule shall be published and distributed by mail. <br />Similarly,initiation of blasting in areas not covered by this schedule shallrequire a new <br />schedule. If, however, proposed changes to the schedule are temporary, governmental <br />bodies and individuals to whom the original schedule was sent shall be notified by the most <br />appropriate means in accordance with the requirements of the regulation. <br />• <br />L~ <br />