Laserfiche WebLink
CIRCES Cost Estimatil>9 Software <br />BULLDOZER WORK <br />PROJECT I DENTIFICATION <br />Task # : 001 <br />Date : 08/15/2002 <br />User : TAS <br />State :Colorado <br />County :Clear Creek <br />Site : Walstrum Ouary <br />Agency or organization name :Division O1 Minerals & Geology <br />Permit or other job action :Final Reclamation <br />Task description :Grade blasted rock off new benches <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:NA <br />Cost Breakdown <br /> Utilization <br />OwnershipcosUhour : $45.95 NA <br />Operatingcostlhour : $87.69 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cosUhour : $30.65 NA <br />Total unit cosUhour : $164.28 Total fleet cost/hour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 330,100 LCY <br />Source of estimated volume :per <br />Source of estimated swell factor : NA <br />Swell Loose <br />factor: NA volume: 330,100 LCY <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,222.9 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 0.05 % (i <br />Average site altitude : 7,000 feet <br />Material weight : 2,800 Ibs/LCY <br />Weight description <br />Granite -Broken <br />Job Condition Correction Factors <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 1.00 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net correction : 0.67 <br />$328.57 <br />Source <br />Adjusted unit production : 1500.04 LCY/hr <br />Adjusted fleet production : 3,000.07 LCY/hr <br />Perm~ob# : M-83-033 <br />Abbreviation :none <br />Filename : M033-001 <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 110.03 Hours <br />Unit cost : $0.110 /LCY Total job cost : $36,152 <br />