Surface Blasting Work cont'd Task # : 001 ~ sheet 2 of 2 <br />BLASTING MATERIALS QUANTITIES QUAMITY UNIT <br />Total quantity of stemming required ~ 1.64 ubic yards <br />Total quantity of explosives required 2,854 ounds <br />Total quantity of det. cord/fuse/wire required 436 /in. feet <br />Quantity of blasting caps used per blasthole 1 cap(s) <br />Total quantity of blasting caps required 9 caps <br />Quantity of primers used per blasthole 1 rimers) <br />Total quantity of primers required 9 rimers <br />Quantity of delays used per blasthole 1 delay(s) <br />Total quantity of delays required 10 delays <br />HOURLY EQUIPMENT COST <br />Shift basis <br />Data source : (user data) <br />Drilling equipment -Drill : REEDRILL SK25 (1996), 6-3/4 in. <br />- Drill pad preparation : NA <br />Misc. drilling support equipment : NA <br />Explosives delivery/prep. -Bulk truck :~FUeI Tanker, 6x4, 210 HP <br />f:nn }n v4 • Flnfh<rl Trur4 dr9 RnK RI/LV <br />Cost Breakdown : Drilling - <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support 'Support Explosives Delivery <br />Bulk Truck Cap Truck <br />Import data filename : drilling NA NA NA miscfruk misctruk <br />Utilization -machine+att. no. 1 : 100 NA NA NA 50 100 <br />-ripper or attachment no. 2 : 0 NA NA NA 0 NA <br />Equipment ownership $/hr : $49.28 NA NA NA $8.53 $8.04 <br />Machine+att. 1 operating $/hr : $63.40 NA NA NA $2.96 $12.36 <br />Ripper or att. 2 operating $/hr : $0.00 NA NA NA $0.00 $0.00 <br />Operator+additional labor $/hr : $31.03 NA NA NA $23.06 $19.25 <br />Unit subtotals : $143.71 $0.00 $0.00 $0.00 $34.55 $39.65 <br />Number of units : i 0 0 0 1 1 <br />Group subtotals : $143.71 $0.00 $0.00 $0.00 $34.55 $39.65 <br />Total work team cosUhour : $217.9f <br />MATERIALS COST <br /> Description Unit Unit Cost Quantity Total Cost <br />Blasting agent : BuIkANFO nom. density pound $0.170 2,853.50 $485.10 <br />Primers or boosters : luminized ANFO booster bag $8.518 9.00 $76.66 <br />Blasting caps : Non-electric cap, delay each $2.460 9.00 $22.14 <br />Det. cord, fuse or wire : Detonating cord, 45 gr./ft. linear foot $0.111 436.00 $48.40 <br />Delays : MS connectors each $3.477 10.00 $34.77 <br />Miscellaneous : none required NA $0.00 0.00 $0.00 <br />Drill bits': bit life= 500.0 linear feet $1,620.00 0.79 $1,280.12 <br />bit life unit =linear toot, bit cost unit =each (per bit) <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br />Total materials cost : $1,947.19 <br /> Job Condition Correction Factors • Site altitude : 7,500 feet <br /> Altitude adjustment: 0.95 (userdata) <br />Total drilling length : 395 linear feet Job efficiency factor : 0.67 (user) <br />Unadjusted drilling rate : 30.00 feeUhour Adjusted drilling rate : 19.09 feet/hour <br />Drilling time : 20.69 hours Explosives prep. time : 1.22 hours <br /> <br />JOB TIME AND COST Total job time : 21.91 hours <br />Total unit cost : $1.375 per cu. yd. Total job cost : $5,011 <br />