My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-08-27_REVISION - M1983033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2002-08-27_REVISION - M1983033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 6:13:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Revision
Doc Date
8/27/2002
Doc Name
Amendment Approval
From
DMG
To
Albert Frei & Sons Inc.
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 08/09/2002 <br />User : TAS <br />State :Colorado <br />County :Clear Creek <br />Site : Walstrom O. <br />Agency or organization name :Division O1 Minerals & Geology <br />Permft or otherjob action :Final Reclamation <br />Task description :Toe Slope Shaping <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 90,000 <br /> Utilization <br />Ownershipcost/hour: $42.44 NA <br />Operating cosUhour : $59.07 100 <br />Ripper op. cosvhour : $0.00 NA <br />Operator cost hour: $30.65 ~ NA <br />Total unit cosUhour : $132.17. Total fleet cosUhour <br />Swell Loose <br />CCY factor: 1.320 volume <br />Source of estimated volume <br />Source of estimated swell factor <br />HOURLY PRQDIYCTtON <br />Average push distance : 100 feet <br />Unadjusted hourly production : 931.6 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 2.00 % (neg) <br />Average site altitude : 6,000 feet <br />Material weight : 2,800 Ibs/LCY <br />Weight description <br />Granite -Broken <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Unit cast : $0.313 /LCY <br />Basic machine :Cat D8R - BU Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br />$264.34 <br />118,800 LCY <br /> <br /> <br />Job Cdr diffon Correction Fact <br />Operator skill ors <br />: 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.10 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.05 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net corcection : 0.45 <br />Source <br />Adjusted unit production : 422.01 LCY/hr <br />Adjusted fleet production : 844.01 LCY/hr <br />PenniUob# : M-83-033 <br />Abbreviation :none <br />Filename : M033-002 <br />Total job time : 140.76 Hours <br />Total job cost : .,537,207 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.