Laserfiche WebLink
Approximate Timetable for Mining Operations <br />Timeline Area, Acres Activity <br />2006-2010 Highwall west of existing mine cut Topsoil pile development <br /> Southern 1/3rd of highwall Bench Development <br /> 10 acres Footwall waste removal <br />2006-2010 Main pit area, 20 acres Ore extraction, waste <br /> removal <br />2006-2010 Lower Waste Dump 5 acres Waste Placement <br />2010-2015 Highwall Area above Topsoil pile development <br /> central 1/3~ of original marble Bench Development <br /> cut, 10 acres <br />2010-2020 Main pit azea progressing north Ore extraction, waste <br /> 30 acres removal <br />2015-2030 Highwall Area above northern 1/3rd Topsoil storage <br /> of marble outcrop progressing north Bench Development <br /> to end of affected land boundary <br /> 10 acres <br />2015-2030 Main pit extended to northern boundary Mazble Extraction <br /> 20 acres Waste Removal along <br /> Hangingwall contact <br />2015-2030 Main pit, south half of cut Waste Placement, <br /> 20 acres Backfilling <br />2025-2030 Lower Mine Site Staging Area <br /> Rock Dump Final Grading, reveg <br />Primary, Secondary, and Incidental Products to be Produced <br />The primary products produced from the Lilly Mines is white marble to be used for <br />cultured marble production, pool construction, and landscape rock. The high quality <br />calcium cazbonate may also be used in cement production and environmental control uses <br />such as acidic soils mitigation. <br />11 <br />