My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-09-19_REVISION - M1997058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997058
>
1997-09-19_REVISION - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:31:06 AM
Creation date
11/21/2007 5:47:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
Revision
Doc Date
9/19/1997
Doc Name
BASELINE RESOURCE - AMENDMENT APPLICATION FOR DMG REGULAR OPERATIONS 112 PERMIT
Type & Sequence
SR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS. CONTINUED <br /> 7 . That all construction debris will be disposed of on land in such a <br /> manner that it cannot enter a waterway or wetland. <br /> 8 . That equipment for handling and conveying materials during <br /> construction shall be operated to prevent dumping or spilling the <br /> materials into the water except as approved herein. <br /> 9 . That measures will be employed to prevent or control spilled <br /> petroleum products , chemicals, or other deleterious materials from <br /> entering the waterway and the permittee will formulate a contingency <br /> plan to be effective in the event of a spill . <br /> 10 . That all work in or along the Huett Seepage Ditch and wetlands is <br /> performed in such a manner so as to minimize increases in suspended <br /> solids and turbidity which may degrade water quality and damage aauatic <br /> life outside the immediate area of operation. <br /> 11 . That fuel storage tanks above ground shall be diked or curbed or <br /> other suitable means provided to prevent the spread of liquids in case <br /> of leakage in the tanks or piping . <br /> 12 . That when the District Engineer has been notified that a filling <br /> activity is adversely affecting fish or wildlife resources or the <br /> harvest thereof and the District Engineer subsequently directs remedial <br /> measures, the permittee will comply with such directions as may be <br /> received to suspend or modify the activity to the extent necessary to <br /> mitigate or eliminate the adverse effect as required. <br /> 13 . That the disposal area, method of disposal, or methods of dredging <br /> will not be changed without prior written approval of the District <br /> Engineer. <br /> 14 . That the clearing of vegetation will be limited to that which is <br /> absolutely necessary for construction of the project . <br /> 15 . That all dredged and excavated materials, with the exception of <br /> that authorized herein, will be placed on an upland site above the <br /> ordinary high water line in a confined area, not classified as a <br /> wetland, to prevent the return of such materials to the waterway. <br /> 16 . That the cross-sectional area of Huett Seepage Ditch is not <br /> reduced . <br /> 17 . That the fill created by the discharge will be properly maintained <br /> to prevent erosion and other non-point source of pollution. <br /> 5 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.