Laserfiche WebLink
IX. VEHICLE HAIIL ROADS <br />CONTROL OPTIONS FOR VEHICLE HAIIL ROADS <br />(DO NOT WRITE IN THIS SECTION) <br />1. Watering (specify) times/day, to maintain moist surface. <br />2. Chemica•1 stabilization <br />(according to manufactur'er's specifications) <br />Specify: <br />a. Frequency of application and <br />b. Type of stabilizer (brand name, or composition) <br />3. Paving to be completed by <br />4. Gravel <br />(date). <br />(LIST HAIIL ROAD CONTROLS IN THE APPROPRIATE SPACES BELOW} <br />A. TRANSPORT OF RAW MATERIAL FROM REMOVAL SITE TO STOCKPILE <br />Distance tone way) raw material is not stockpiled <br />If stockpile is off site, give distance from removal site to mine entrance <br />Haul vehicle capacity No. of wheels <br />Average vehicle speed m.p.h. <br />Maximum vehicle speed m.p.h. (cannot exceed 30 m.p.h) <br />No. of trips per day <br />Haul road silt content (if known) %. <br />List controls for raw materials transport: (see measures listed above) <br />Proposed controls <br />11 <br />