Laserfiche WebLink
VIII. FINISHED PRODUCT <br />A. LOADING INTO FINISHED PRODUCT STOCKPILE <br />Method of loading in (front-end loader, conveyor, etc.) <br />_ convevor <br />If conveyor is used, what is maximum drop height? 25 ft. <br />Loading schedule: 600 tons/hour ZO hours/day 300 days/year <br />Proposed controls moist material <br />Controls for loading to stockpile include other {specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />B. FINISHED PRODIICT STOCKPILE <br />Maximum tons stored at one time 500.000 tons. <br />Length of time pile remains undisturbed 12 months <br />Proposed controls: (check appropriate boxes) <br />^ Watering times/day, or <br />maintain moist surface). <br />^ Chemical stabilizer (applied <br />specifications}. <br />a <br />Compacting of piles, method <br />Enclosures: <br />continuous sprinkler (to <br />according to manufacturer's <br />complete, or partial {check one) <br />Revegetation, (length of time till revegetation <br />Other (specify) Moist Material <br />No control <br />C. LOADING OUT FROM STOCKPILE FOR FINAL TRANSPORT <br />Method of loading out (front-end loader, conveyor, etc.) <br />front end loader <br />If conveyor is used, what is maximum drop height? ft. <br />Loading schedule: 400 tons/hour 10 hours/day 300 days/year <br />Proposed controls no Controls <br />Controls for loading out of stockpile include: Water injection, chemical <br />dust suppressants, bag collectors, other (specify), no control, water <br />sprays, total enclosure, partial enclosure, chemical suppressants, reduced <br />drop height, telescoping chute. <br />10 <br />