Laserfiche WebLink
Maximum tons crushed _ r year 250.000 tons. <br />Maximum tons crushed per hour 400 tons. <br />Hours of crushing per day 10 hours. <br />Proposed :controls (see above} water sprav as needed <br />D. RESCREENING/CLASSIFYING <br />Maximum tons screened per year 500,000 tons, <br />Maximum tons screened per hour 600 tons. <br />Hours of rescreening per_day 10 hours, <br />Proposed controls {see above) water sprav as needed <br />VII. CONVEYORS/TRANSFER POINTS <br />A. <br />Tons of material conveyed per year 800,000 tons. <br />Tons of material conveyed per day 8,000 tons. <br />Proposed controls moist material <br />Controls for conveyors include: Full enclosure, partial enclosure, no <br />control, other (specify). <br />(INDICATE ON A SEPARATE DIAGRAM HOW CONVEYOR SYSTEM IS SET IIp} <br />B. TRANSFER POINTS <br /> <br />Number of transfer points 45 <br />Proposed controls moist material <br />Controls for transfer points include: Full enclosure, partial enclosure, <br />water sprays, chemical suppressants, no controls, other {specify) <br />9 <br />