My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-11_REVISION - M2000016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2003-02-11_REVISION - M2000016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:00 PM
Creation date
11/21/2007 5:45:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
2/11/2003
Doc Name
construction permit
From
dept of public health and enviroment
To
lafarge
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. LOADING OUT FROM KAW MAPISKIAL STOCKPILE: <br />Method of loading out (front-end loader, conveyor, etc.) <br />raw material is not stockpiled <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total exposure, partial <br />exposure, moist material, other (specify) <br />VZ. PROCESSING <br />Will processing (i.e., crushing, screening, etc.) occur on site? <br />X Yes ^ No (check one) <br />NOT$: ALL PROCESS EQIIIPMENT REQIIZRES A SEPARATE PERMIT APPLICATION AND <br />ADEN (SEPARATE FORM IS ATTACHED AT END OF THS FORM - MAKE ADDITIONAL COPIES <br />AS NEEDED). <br />Material loaded into processing equipment by: <br />Conveyor Front end loader X Other <br />CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br />moisture ~ if known); water spray bars, bag filters, other <br />(specify), no control. If existing processing equipment will be <br />relocated from another location complete the following sections. <br />This equipment must already be permitted. <br />(LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW} <br />A. PRIMARY CRUSHING <br />Maximum tons crushed per year 500,000 tons. <br />Maximum tons crushed per hour 600 tons. <br />Hours of crushing per day 10 hours. <br />Proposed controls (see above) water spray as needed <br />B. SCREENING/CLASSIFYING <br />Maximum tons screened per year 800.000 tons. <br />Maximum tons screened per hour 630 tons. <br />Hours of screening per day 10 hours. <br />Proposed controls (see above) water Spray aS needed <br />C. SECONDARY CRUSHING <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.