Laserfiche WebLink
V. RAW MATBAIAL <br />A. REMOVAL <br />MATERIAL ROCK COAL sand & <br />ravel <br /> <br />Tons removed per year 1,000,000 <br />tons" <br /> <br />Maximum tons removed per day 8,000 tons <br />Equipment used for removal front end <br />loaders <br />Equipment capacity (in tons) 10 tons <br />Est. hours per year required for removal 2,500 <br />Is material dzy, moist, or wet? moist <br />Specify moisture content if known (~) unknown <br />B. LOADING IN TO AAW MATBRIAL STOCKPILE <br />Method of loading in (truck bottom dump, front-end loader, etc.) <br />raw material is not stockpiled <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total enclosure, partial enclosure, <br />chemical suppressants, reduced drop height, telescoping chute,-other (sp'ecify) <br />C. RAW MATERIAL STOCKPILE <br /> <br /> <br />MATERZAL <br />ROCK <br />COAL OTHER <br />Maximum tons stored at any one time NA <br />Length of time pile remains undisturbed <br />Proposed controls for raw material stockpile: (check appropriate boxes} <br />^ Watering times/day, or _ <br />moist surface). <br />^ Chemical stabilizer (Type: <br />^" Compacting of piles, method <br />^ Enclosures: complete, or <br />^ Other tspecify) <br />^ No control <br />continuous sprinkler (to maintain <br />partial (check one) <br />7 <br />