My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-02-11_REVISION - M2000016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2003-02-11_REVISION - M2000016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:00 PM
Creation date
11/21/2007 5:45:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
2/11/2003
Doc Name
construction permit
From
dept of public health and enviroment
To
lafarge
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. FINISHED PRODUCT TRANSPORT (ON SITE) <br />1. Haul Trucks NOTE: Truck Size varies -trucks are contracted . <br /> <br />CAPACITY EMPTY <br />WEIGHT NO. OF <br />TRUCKS NO. OF <br />WHEELS NO. OF TRIPS <br />PER/DAY AVG. SPEED <br />ON SITE <br />1. 16.2 tons 10.8 tons varies 10 3i0 one way 10 mph <br />2. Yds. mph <br />3. Yds. mph <br />4. Yds. mph <br />2. Haul Road Information F.or Final Transport <br />On site haul roads distance (oae way) approximately 500 ft. <br />Haul road silt content (if known) unknown ~. <br />List controls for final transport: {see control measures) <br />Proposed controls : Water spra}! as needed. Entrance Road will begraveled. <br />C. OTHER ROADS ON-SITE <br />WHAT IS ROAD LENGTH OF (DISTANCE) <br />USED FOR? ROAD? FROM TO CONTROLS {SEE PAGE 8) <br /> NorPe <br /> 1000 ft. WCR 8 Oil <br />1. Oil Well Well <br />Service Road <br />2. <br />3. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.