My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-12_REVISION - M1974069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974069
>
2003-03-12_REVISION - M1974069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:00 PM
Creation date
11/21/2007 5:41:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974069
IBM Index Class Name
Revision
Doc Date
3/12/2003
Doc Name
OSE Liner Approval
From
Loveland Ready Mix Concrete Inc
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXFIIBTf L <br />RECLAMATION COSTS <br />Revised March 7, 2003 <br />The estimated cost of reclamation for mining cells #6 and #7 (Storage pond #2), for <br />mining and reclaiming cells number 8 and 9, for leveling and seeding the settling ponds, <br />and for grading and seeding the waste azea is $204,680.00. <br />Compacted liner onn d #2: This includes placing and compacting the liner, placing the <br />slope shale and spreading topsoil down to waterline for the entire 3,840 L.F. of lining for <br />Storage Pond #2. <br />Compacted overburden: 25,000 cy $3.00 $ 75,000 <br />Uncompacted shale 57,600 cy .25 14,400 <br />Topsoil 1,400 cy .40 560 <br />Seeding 2.00 AC 200.00 400 <br />$ 90,360 <br />Reclamation of Cells #8 & #9: The reclamation of cells #8 & #9 will occur <br />concurrently with the mining of the cell. The gravel in this area is only 8' to 12' deep <br />with three to four feet of overburden and topsoil. At any one time we will have about <br />1000 feet of pit wall to bacldll, slope, and reclaim and about 5 acres to reseed. In total, <br />the costs of backfilling overburden, topsoil application, and reseeding -including <br />backfdling and seeding cell #9 -are as follows: <br />Backfill overbwden: <br />Topsoil Application <br />Final Grading/Comouring <br />Grass seeding <br />170,000 cy $.50 $ 85,000 <br />15,300 cY 40 6,120 <br />19 AC 200.00 3,800 <br />19 AC 200.00 3,800 <br />$ 98,720 <br />Reseed Topsoil Stockpile Area: The Topsoil stockpile will occupy about 2 acres. <br />Final Grading 2 AC 200.00 $ 400 <br />Grass Seeding 2 AC 200.00 400 <br />$ 800 <br />Grade and Seed Settlin Ponds: The &nal area of the settling ponds will be about 5 acres <br />with 2 acres of open water pond remaining. <br />Final Grading 5 AC 1000.00 $ 5000 <br />Grass Seeding 5 AC 200.00 1000 <br />$ 6000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.