Laserfiche WebLink
Topsoil and Seed Waste Area: The waste area will be graded, covered with <br />clean fill with no rocks or waste concrete, graded and reseeded. About 2 acres remain to <br />be graded and covered and 10 acres to be topsoiled and seeded. <br />Final Grade 3200 cy .50 $ 1600 <br />Final Topsoil 8000 cy .40 3200 <br />Final Grade 10 AC 200 2000 <br />Grass Seeding ] 0 AC 200 2000 <br /> $ 8800 <br />Liner for Storage Pond #1 <br />Storage Pond #1 has been lined in accordance with the Earth Engineering Consultants' <br />design (see Exhibit G) and was accepted by David L. Nettles, Assistant Division <br />Engineer for the Office of the State Engineer on August 24, 2000 per the attached letter. <br />