Laserfiche WebLink
~ ~ <br />Floor Removal Costs <br />Laboratory 40x75 = 3,Oo <br />Administration 40x75 = 3,000 t, <br />Shop and Warehouse 50x135 = 6,750 ft2 <br /> 50x90 = 4,500 ft2 <br />Mill Building 50x140 - 7,000 ft2 <br />Desorption Room 19x60 = 1,140 ft2 <br /> 19x40 = 760 ft2 <br />Cyclone Cluster 35x32 = 1,120 ft2 <br />Leach Tank Area 190x80 15,200 ft2 <br />Total 42,470 ft2 <br />All floors will be 6 inch thick concrete reinforced with wire mesh <br />except the refinery floor and the leach tanks. The cost for removal <br />of concrete reinforced with wire mesh is 53.00/ftz. <br />53.00/ftz x 42,470 ftz 5127,410 <br />All other mill area costs to remain the same. <br />Ripping Mill Area S 630 <br />Grading Mill Area S 3,133 <br />Topsoil Replacement 525,975 <br />Topsoil Grading S 4,700 <br />TOTAL MILL AREA COSTS 5328,453 <br />13.6 Seeding Costs <br />Seeding costs have been revised to include the total acres <br />which will be disturbed as a result of the amendment. Seed, <br />fertilizer and equipment costs have been taken from the approved <br />permit document. <br />L-7 <br />