Laserfiche WebLink
Water Trucks <br />Two 3,500 gallon capacity water trucks will be used to spray the <br />tailings facility for dust control for approximately 6 months during <br />reclamation. Watering is not expected to be needed every day. <br />2 x S50/hour x 8 hours/day x 20 days/month x 6 months = 596,000 <br />Summary of Miscellaneous Costs <br />Mobilization/Demobilization S 1,100 <br />Road Maintenance = S 57,600 <br />Water Samples S 79,120 <br />Monitoring Well Abandonment = S 1,300 <br />Water Trucks 9f 6.000 <br />TOTAL 5235,.120 <br />13.5 Mill Facilities <br />Buildings <br />Laboratory 40x75x14 42,000 ft3 <br />Administration 40x75x14 42,000 ft3 <br />Shop and Warehouse 50x135x40 = 270,000 ft3 <br /> 50x90x14 = 63,000 ft3 <br />Mill Building 48x50x140 336,000 ft3 <br />(small structure on top) 15x20x45 = 13,500 ft3 <br />Desorption Room 55x19x60 62,700 ft3 <br /> 22x19x40 = 16,720 ft3 <br />Cyclone Cluster 20x35x32 = 22,400 ft3 <br />Refinery (located on top of 14x53x15 11,130 ft3 <br />leach tanks) <br />Leach Tanks 40ft tall x 40ft diameter = 402 1 4 ft3 <br /> 1,281,574 ft3 <br />Building removal costs are estima ted at S .13/ft3 <br />Building Demolition and Disposal Costs 5166,605 <br />L-6 <br />