641 acres x 5122.95/acre ~ 578,811 <br />641 acres x 1 hour/acre x 540/hour = 525,640 <br />641 acres x 550/acre = 532,050 <br />TOTAL SEEDING COSTS = 5136,501 <br />13.5 Reclamation Cost Summary <br />The reclamation cost summary includes reclamation costs revised <br />as a part of this amendment and reclamation costs which have not been <br />revised and which have been taken from Exhibit L of the approved <br />permit document. <br />A. Pits <br />8. Rock Toe Buttress <br />C. Waste Rock Disposal Areas <br />D. Tailings Facilities <br />E. Mill Facilities <br />F. Roads <br />G. Seeding <br />H. Trees <br />I. Miscellaneous Costs <br />TOTAL RECLAMATION COSTS <br />Contingency of 25X <br />TOTAL BONDING REQUIREMENTS <br />S 150,240 <br />359,937 <br />919,612 <br />434,953 <br />328,453 <br />45,859 <br />136,501 <br />8,334 <br />235.120 <br />52,619,009 <br />S 654.753 <br />53,273,762 <br />The bond agreed to under the original permit by MLRD and Battle <br />Mountain was for 53,300,300. Battle Mountain will keep the original <br />53,300,300 bond in place. <br />L-8 <br />