Laserfiche WebLink
CIRCES Cost Estlmating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 State :Colorado <br />Date : fa17l1005 County <br />User : ESC Site <br />WeM <br />S 6 H Mine <br />Agency or organization name :Division O/Minerals 8 <br />Permit or other job action <br />Task description : Backfill 8 Grade <br />HOURLY EQUIPMENT COST <br />Pennitfjob# : M-2000-158 <br />Abbreviation :none <br />Filename : M158-002 <br />Basic machine :Cat D10R - fOSU Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shitt basis : 1 perday <br />Attachment no. 2 :lshank ripper <br /> Data source : (CRG) <br /> Utilization °~ <br />Cost Breakdown : Ownership cosUhour : $89.70 NA <br />Operatingcosf/hour: $128.62 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator costlhour : $31.78 NA <br />Total unit costlhour : $230.11 Total fleet cosUhour : f 230.11 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 136,400 LCY factor : NA volume : 138,400 LCY <br />Source of estimated volume :DMG Estimate- Etased on 65 acres <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Conection Factors Source <br />Operator skill : 0.75 ~ (avg.) <br />Average push distance : 150 feet <br />Unadjusted howdy production : 1,243.2 LCYlhr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % <br />Average site altitude : 4, 770 feet <br />Material weight: 2,900 Ibs/LCY <br />Weight descdpton <br />Sand and gravel - Drv <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Material consistency : 1.00 (Cat HE <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shiR/da <br />Spoil pile : 0.80 ((nd-rf) <br />Push gradient : 1.22 (Cat HB <br />Altitude : 1.00 (Cat HB <br />Material weight : 0.79 (Cat HB <br />Blade type : 1.00 (S/SU/U <br />Net conection : 0.48 <br />Adjusted unit production : 601.50 LCYlhr <br />Adjusted Fleet production : 801.50 LCY/hr <br />Total job time : 226.77 Hours <br />Unit cost : $0.383 /LCY Total job cost : (52,180 <br />