Laserfiche WebLink
sheet 7 of 2 <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :DMG <br />003 State :Colorado <br />10H7/2005 <br />ESC <br />County :Weld <br />Site:SBHMine <br />Permiujob # : M-2000-158 <br />Abbreviation :none <br />Filename :M15B-003 <br />Permit or otherjob action : Tr-03 <br />Task description :Replace Topsoil on 65 Acres <br />.: <br />_. ;. <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />COSt Bn <br />Scraper work team -Scraper :Cat 637G <br />-Push dozer :Cat D10R - 10SU <br />Support equipment -Load area :~NA <br />-Dump area:NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />rakdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : screpe2 dozer NA NA NA NA <br />°~ Utilization-machine : 100 94 NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhipcosuhour: $72.99 $60.00 NA NA NA NA <br />Operating cosuhour : $169.74 $121.37 NA NA NA NA <br />Ripper op.cosuhour: NA $0.00 NA NA NA NA <br />Operetorcosuhour: $31.97 $31.78 NA NA NA NA <br />Unit subtotals : $274.69 $213.16 NA NA NA NA <br />Number of units : 3 1 0 0 0 0 <br />Group subtotals : Work : $1,037.24 Support : $0.00 Maintenance : $0.00 <br />Total work team cosuhour : $1,037.24 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 52,430 LCY factor : NA volume : 52,430 LCY <br />Source of quantity takeoff :DMG Estimate info. from <br />Source of estimated swell factor : NA <br />