My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-10-18_REVISION - M2000158 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000158
>
2005-10-18_REVISION - M2000158 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:24 PM
Creation date
11/21/2007 5:38:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
Revision
Doc Date
10/18/2005
Doc Name
Application Adequacy Review
From
DMG
To
Platte Sand & Gravel LLC
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task no.: 001 <br />Date : 10/18/2005 <br />User : ESC <br />State :Cobrado PenniUjob no.:M-2000-158 <br />County :Weld Abbreviation :none <br />Site <br />S 8 H Mine <br />Agency or organiza0on name Division Of Minerals B <br />Permit or other job action :1T2-03 <br />Task descdption :Pump out Water to Fae/BWte Backfil/fng d Grading <br />COST <br /> <br />Descrip8on Quantity Data <br />Source <br />Pump • Centrifugal pump, f0.0in. 2 (CRG) <br />Suction hose : SucBon pipe, 10 in. diem., 20 ft. L 10 (CRG) <br />Discharge hose : Discharge pipe, 101n. D, 50 ft L 4 (CRG) <br />Labor: NA 0 NA <br />Cost Breakdown : Job Utilization <br />Ownership cost/hour : $10.36 NA Job shift basis : 3 per day <br />Operating cosUhour : 519.64 100 % Horsepower : 70 <br />Operator cosf/hour : $0.00 NA Weight (UST) : 1.95 <br />Total cost/hour : $30.00 <br /> Total fleet cost/hour : $30.00 <br /> <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume: 38,115,000.00 cubic feet factor : 7.4805 volume: 285,119,258 gallons <br /> <br />Total pond inflow surface Unit inflow rate in Total pond inflow volume <br />area : 146,880 sq. ft. gph/sq. fl. : 0.3516 per hour : 51,643.01 gph <br /> <br />Source of volume estimate : DMG Estimate- Permit Information <br /> <br />PUMPING TIME <br />Rated pump capacity : 200,000 gphlpump Total pumping capacity : 400,000 gph <br /> Initial unadjusted pumping time : 712.80 hours <br />Inflow as % of pond volume : NA % Inflow dudng initial pumping timf 36,811,040 gallons <br /> Net unadjusted pumping time : 804.83 hours <br /> <br /> Pump efficiency factor : 0.9167 (55 min.ihr.) <br /> Total adjusted pumping time : 877.98 hours <br /> <br />JOB TIME AND COST <br /> Total job time : 877.98 hours <br />Unit cost : $0.000082 per gallon Total job cost : 526,338 <br /> <br />Filename : M158-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.