Laserfiche WebLink
Filename : M158-000 <br />Agency or organization name :Division Of Minerals 8 Geology <br />Pernik or iob action : 7R-03 <br />TASK LIST 101RECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Pump Pit Water to Facilitate Backfilling & Grading pumping 1 877.0 $26,336 <br />002 -Backfid d Grade Sbpes dozer 1 227. 552,180 <br />no3 -Kedges Topsoil on 65 acres _ scraped 1 42. $44,509 <br />004 -Raregatate65~aes •°•°a° ~ -'-- ---•- - <br />005 -MoibdimBpruDenlo6iliza8al mobilize 1 3.7 53,202 <br />008 -Amlor 1,000 Ieet o/Exposed Shoreline with Riprep Matedai NA 1 80. 5238,250 <br />(TR oommitrnent to armor 500 feet of exposed shoreline (plus 500 feet) <br />am given time ~ 5238.25/lin.ft. See DMG memo dated 5-1T-01) <br />• inGudea inflation rector adjustment or <br />INDIRECT COSTS <br />OVERHEAD AND PROFR <br />County :Weld <br />NA <br />o~ <br />SUBTOTALS: 7~ z~o.a <br />TOTAL DIRECT COST' <br />Liability insurance : 2.02 % of direct total = $7,826 <br />Performance bond : 1.05 %ofdirect total = 54,068 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = 538, 742 <br />• rrof raquiad (dr ~. opdaAor turves as super.) TOTAL O & P = <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - CONTRACT AMOUNT (diretl + O 8 P) _ <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contrect/bid preparation : NA NA NA total = <br />Reclamation management and/or administration : 5.00 % of cnV. NA total = <br />NA <br />CONTINGENCY • NA' NA total = rv~r <br />,oonMprsies aocanred RlrM task bvel TOTAL INDIRECT COST= 57539 <br />TOTAL BOND AMOUNT {direct + Indirect) = 5439,959 <br />