Laserfiche WebLink
c c~ <br />Terry Tunnel Bulkhead Costs <br />Pegs 4 <br />MISC. COSTS <br />BNGINHBRING DS92GN $4535 <br />BNGINSBRING INSPHCTION (DeBign Brtginaer) $2077 <br />M1ITBRIAL3 TESTING S 168 <br />MISC SMALL HAND TOOL USAGE Lump Sul $3000 <br />MISC MATBRI)-LS (ie nei1 6, bitm, wire, eto) Lump Sum $3000 <br />DISSBL Leap Sum $1500 <br />SLSCTRICITY $5000/mo 3 m0 $15000 <br />AT LOCOMOTIVE U311GB 56000/m0 3 mo $18000 <br />COMPRESSOR USAGE $3000/m0 3 mo $9000 <br />AIR-BEAN as Puap Dsage $ 400/,.0 3 mo $laao <br />FLIGHT 13 RP Pump Usage $ 540/ad 3 mo $16a0 <br />GD 83 JACRLEG $ 375/no 3 mo $11a5 <br />ovrBlDa LOADER geooo/mo 3 mo $leoa0 <br />311PBT1t SUPPLIES Lump Bus $IQQ.Q <br /> SubTOtal $79aa5 <br />PL1-CB LIMESTONE 11T BULKHEAD 11ND SCREEN DRIFT TO XEEP DEBRi9 FROM BULRH871D <br />PIPE INTAEE: (5 men - 5 days) <br />EQUIPMEmr: <br />1 1/4 yd LHD @ $35/hr 50 hra $1750 <br />Porklitt @ $20/hr 50 hre $1000 <br />DIRECT LABOR @ $16.39/hr 250 hra $4096 <br />BENEFITS @ 35• of rages $1434 <br />INDIRECL LABOR outside man i <br />hoistman @ $16.39/hr 100 hrs $1639 <br />BENEFITS @ 353 of wages $ 574 <br /> <br />Lime (8000 1bB) $ 567 <br />Lim+aetone (550D0 lbs) $1549 <br />Screen Lump gum S 200 <br />SubTotal $12831 <br />