Laserfiche WebLink
.. ~_ ~. <br />Terry Tunnel Bulkhead Costa <br />Page 5 <br />INSTALL VENTILATION: (2 men - 2 days Setups Contractor - B days) <br />DIRECT LABOR @ $16.79/hr <br />BENHFITS @ 36= oY vagea <br />EQUIPMENT: <br />40 hra $ 666 <br />$ 229 <br />Generator - 128 RM @ 5400/wk 2 aks <br />2 x 10 Pan @ $3000 purchase <br />Flatbed Truck and Loader @ $76/hr 20 hrs <br />CONTRACTOR CHARG83 to Install (includes Equipment) <br />SUPPLI83: <br />Vent Hag 20' x 3800• <br />SubTOtal <br />TOTAL TERRY TUNNEL BULRREAD DIRECT C03T9 <br />$ 800 <br />$3000 <br />$ 700 <br />$6400 <br />$t7S5 <br />$16660 <br />$220,691 <br />