Laserfiche WebLink
c <br />Terry Tunnel Bulkhead Costa <br />Page 3 <br />1 - concrete vibrator ($770 value) <br />@ $70/day <br />1 - 1 1/4 yd. LEID @ $35/hr <br />1 - Forklift @ $20/hr <br />Roller Conveyors($2605 value) <br />@ $250/no <br />DIRBCT L71BOR @ $16.39/hr <br />HOURLY OVSRTLIIB COSTS DURING POITR <br />S1-L7iRY COSTS DURING POUR <br />HBNBFIT9 @ 35i of wages <br />INDIRBCT LJIBOR outside nan i <br />hoistman @ $16.39/hr <br />BBNBPITS @ 35i of wages <br />CONTRJiCT Li1BOR for Pour <br />NATBRIAI.4: <br />Concrete ![ix - 60 lb bags <br />3 truckloads @ 770 bags/truck <br />(42i extra) <br />Delay Set <br />Plasticiser <br />Type V Portland Cement <br />(94 lb bags) @ $5.60/ea <br />F[eals during pour <br />r <br />2 $ 60 <br />100 hra $3500 <br />100 hrs $2000 <br />3 wks $ 250 <br />890 hre $14587 <br />Loup Suu $1598 <br />Lump 3uu $2183 <br /> $6429 <br />200 hre $3278 <br /> $1147 <br /> S 864 <br />Loup sun $6679 <br />Lump Sum $ 248 <br />Luny Suf $ 136 <br />50 $ 280 <br />Lump Sus s say <br />SubTOtal $4!684 <br />STRIP FORKS, NDVS BQUIPNBNT 11ND GROUT BULRH871D: (3 men - 12 days) <br />SQUIPNI'JIT: <br />GD 83 Jackleq (in Nisc Coats) <br />Grout ![fixer i Pump ($8500 value) <br />$700/mo1 $a50/Mk 2 weeks $ 500 <br />1 1/4 yd LND @ $35/BR 120 hrs $4]00 <br />DIRBCT L~1BOA @ $16.39/hr 360 hrs $5900 <br />BSNSFITS @ 35t of wages $2065 <br />INDIRBCT L71BOR outside man i <br />hoiatman @ $16.39/Hlt 240 hrs $3934 <br />BSNRFITS @ 35= of wages $1377 <br />NATBRIAL3: <br />Packers @ $120.00 ea 4 $ 480 <br />Type V Portland Cenant <br />(94 Ib. begs) @ $5.60 es 20 g 112 <br /> 3uDTota1 $18568 <br />