My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-21_REVISION - M1983141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-21_REVISION - M1983141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:35:56 PM
Creation date
11/21/2007 5:34:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/21/2006
Doc Name
Cost Estimate for Water Impounding Bulkheads
From
DMG-acs
To
DMG-tas
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~.. ~ <br />Terry Tunnel Bulkhead Coats <br />Page z <br />WATHRII-L9: <br />Timber: <br />B^x8^Y16' 94S (1450+psi) @ 183.03 12 $2196 <br />z^x6^x11' 949 (1800+pei) @ $15.86 24 $ 381 <br />2^X12'x14'S49 (1000+psi) @ $18.73 8 $ 150 <br />8^ DRI8C0 pipe rith flanges @ Sa.39/Pt 50 $ 420 <br />/10 Reber GR60 Y 40' @ $66.31 14 $ 928 <br />/6 Reber GR 60 x 40' @ $14.22 9 $ 128 <br />Concrete Blocks (pipe support)@ $252 L9 1 $ 252 <br />6^ Sch. 80 316E 99 pipe x 11' rich 300/ <br />flange, 150f Planga and 3 seep rings 1 $2250 <br />1^ 9ch. 80 316E SB pipe (11'length)- <br />r/ couplings, seep collars, fittings, <br />Valves and pressure gauge. 1 $ 618 <br />6^ 316E 9H HITX Gate Valve - Cl sas 300 1 $3986 <br />Mist bolt packages end gaskets 1 $ 155 <br /> <br />Frei ht <br />9 <br />t <br /> otal <br />Sub $26855 <br />BRACE BULRR811D: (3 men - 4 days) 1 relder - 2 days) <br />BqulP~trr: <br />Welder end Torch @ $100/day 2 $ 200 <br />GD 83 Jackleq (in Miac Coates) <br />DiRHCT LABOR @ $16.39/hr 140 $2295 <br />BENEFITS @ 35= OP raga6 $ 803 <br />INDIRBCT LABOR outside man i <br />hoietman ! $16.39 80 $1311 <br />BENRFITS @ 35k of rages $ 459 <br />NATBRL31I.4 s <br />Angle 5/16"x4^x6^ $4.23/LP 70' $ 296 <br />/8 Threadbar GR 60 @ $1.36/I.F 120 LP $ 163 <br />~8 Bevel and Flat Waehera @ $1.01/pair 70 $ 71 <br />2• schedule 20 pipe @ $3.70/LF 40' $ 148 <br />Celtite @ $27.04/case T $ 81 <br /> otal <br />Sub $5827 <br />38T UP AND POUR HULBHBAD: (5 men-10 days; 13 men, 4 staff-2 days + overtime) <br />BQtJIPM6RT: <br />2 - 9 cu.ft.mixera($5822 value) ! $500/mo 3 wke $ 500 <br />1 - Auger teed ($2800 value) @ $250/mo 3 rka $ 250 <br />1 - N20 Reed Concrete Pump ($39,786 value) <br />e Saooo/mo 3 wke $zooo <br />w/ 150' - 4^ concrete pipe and hose <br />($4211 velua) @ $350/mo 3 aka $ 350 <br />
The URL can be used to link to this page
Your browser does not support the video tag.