Laserfiche WebLink
CIRCES Cost Estimatlna Software <br />Task # : 001 <br />Date : 03/22/2007 <br />User : ESC <br />State :Colorado PermiUjob# : M-1999-083 <br />County :Ladner Abbreviation :none <br />Site :Red Wolf Quarry Filename : M063-001 <br />Agency or organization name :DRMS <br />Permit or other job action :Surety Increase <br />Task description :Grading 6 Rfpping o/Dfsturbed Area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series ll - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization °h <br />Cost Breakdown : Ownershipcost/hour : $58.24 NA <br />Operating costlhour : $73.75 100 <br />Ripper op.cosUhour : $3.43 50 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $168.20 Total fleet cosUhour : $188.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,500 BCY factor : 1.215 volume : 3,038 LCY <br />Source of estimated volume :DRMS Estimate <br />Soume of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 150 feet <br />Unadjusted hourly production : 634.3 LCY/hr <br />Material consistency description <br />Consolidated stockoile <br />Average push gradient : 0.00 % (! <br />Average site altitude : 6,500 feet <br />Matedal weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock - 75% Rock. 25% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.764 /LCY <br /> <br /><: <br />~ Condition Correction Factors <br />Source <br />Operator skill : 0.75 (avg.) <br />Matedal consistency : 1.00 (Cat HB <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Jab efficiency : 0.83 (lshiff/da, <br />Spoil pile : 0.80 (fnd-rfJ <br />Push gradient : 1.00 (Cat HB, <br />Altitude : 1.00 (Cat H8, <br />Matedal weight : 0.70 (Cat HB, <br />Blade type : 1.00 (S/SU/U, <br />Net correction : 0.35 <br /> <br />Adjusted unit production : 220.08 LCY/hr <br />Adjusted fleet production : 220.08 LCY/hr <br />Total job time : 13.80 Hours <br />Total job cost : $2,321 <br />