Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 23-Mar-2007 <br />User: ESC <br />Permit or job no. <br />Abbreviation <br />Filename <br />111999-083 Site :Red Wolf Quarry <br />none State :Colorado <br />M063-000 County:Larimer <br />Agency or organization name : DRMS <br />Permit or iob action :Surety <br />Increase <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Grading & Ripping of Disturbed Area dozer 1 10.0 $2,321 <br />002 -Replace Toposoil on Affected Land dozer 1 6.4 $1,055 <br />003 -Revegetate Disturbed Area revege 2 40.0 $2,045 <br />004 Mobilization/Demobilization mobilize 1 4.8 $2,065 <br /> SUBTOTALS: 81.29 $7,488 <br />' indudes inflation factor adjustment of : NA % TOTAL DIRECT COST' - $7,488 <br /> <br />.CT COSTS <br />OVERHEAD AND PROFIT - Liability IRSUranCe : 2.02 % Of dlreCt total = $151 <br />Performance bond : 1.05 % o/direct total = $79 <br />Job superintendent : NA• NA NA total = NA <br />Profit: 10.00 %ofdirect total= $749 <br />' nor required (w eqp. operator serves as super.) TOTAL O & P = $978 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (dived+O&P)= $$,464 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work andlor contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $423 <br />CONTINGENCY- NA• NA total= NA <br />'contingencies xcoun(ed for at task level TOTAL INDIRECT COST= $1,402 <br />TOTAL BOND AMOUNT (direct + indirect) _ $8,888 <br />