My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-26_REVISION - M1999063
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999063
>
2007-03-26_REVISION - M1999063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 5:06:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999063
IBM Index Class Name
Revision
Doc Date
3/26/2007
Doc Name
Notification of Increase in Bond
From
DRMS
To
Abe Vasquez
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 03/22/2007 <br />User: ESC <br />County : Ladmer <br />Site :Red Wolf Quany <br />Agency or organization name :ORMS <br />Permit or other job action :Surety Increase <br />Task description :Replace Tops <br />HOURLY EQUIPMENT COST <br />on AtTected Land <br />Basic machine :Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utllization <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br />Operating cosUhour : $73.75 100 <br />Ripperop. casNhour: $0.00 0 <br />Operator cosUhour: $32.78 NA <br />Total unit cosUhour : $164.77 Total Beet cosUhour : j184.77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,210 CCY factor : 1.125 volume : 1,381 LCY <br />Source of estimated volume :Average 3" of topsoil <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly produc8on : 491.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 6,500 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Matedal consistency : f.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Adjusted unit production : 212.54 LCY/hr <br />Adjusted fleet production : 212.54 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 8.40 Hours <br />Unit cost : $0.775 /LCY Total job cost : 51,055 <br />State :Colorado <br />PenniUjob# : M-1999-063 <br />Abbreviation :none <br />Filename :M063-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.